Mitsubishi MU-2 Ground School will consist of a 4-day class for Initial Students and a 3-day class for Recurrent Students. All MU-2 systems will be covered by LECTURE, POWER POINT PRESENTATION and CLASS PARTICIPATION, followed by ASSIGNED HOMEWORK and TESTS.
Training can also be conducted at the student's location if desired. We strive to meet your schedule.
| MU-2 GROUND SCHOOL SCHEDULE |
| Day 1 - Initial Students |
| |
General Overview and History of the MU-2 Aircraft and what makes it different.
General Review of Aerodynamics, Instrument Approaches, Multi-Engine Flying, and Turbine Engine Procedures.
Preflight...yourself, the weather, and the Aircraft. |
| Day 2 - Initial and Recurrent |
| |
General (recurrent)
Fuel System
Landing Gear and Brakes
Environmental Systems
Lighting & Warning Systems
|
| Day 3 - Initial and Recurrent |
| |
Power Plant
Anti-Ice and De-Ice Systems
Electrical System
Flight Controls
|
| Day 4 - Initial and Recurrent |
| |
Systems Tests, Engine Shut Down, and Air Start
Performance Tests
Auto Pilot Workbook
Final Test
|
Flight review and icing training as required by A.D. 2003-22-07 will be received.
High altitude operations will be given if required. |
| MU-2 Flight Training |
Flight Training will be conducted in the MU-2 aircraft. All maneuvers will be to the practical test standards for the certificate held by the applicant.
Aircraft Prep:
Weight and Balance
Aircraft Inspection Status
Aircraft Documents
Preflight of Aircraft
Maneuvers:
Stalls (Clean, Approach to Landing & Accelerated) Slow Flight, Steep Turns, Take-Offs & Landings (Normal, Cross Wind & Short Field) Taxing and Emergency Single Engine Procedures
Instrument Procedures:
IFR Holds, Precision (ILS) and Non Precision (VOR, NDB & CIRCLING) Approaches, Missed Approaches, and Single Engine Approaches
Aircraft Systems Checks
Flight Training Phase Check (Check Ride)
|
© 2003 Professional Flight Training, L.C. |